Asbestos Management Surveys in London
Asbestos management surveys in London for residential properties, the communal areas of blocks of flats, HMOs and commercial premises. The survey identifies and assesses asbestos-containing materials within its scope. The standard price includes one sample collected by the surveyor and its analysis by a UKAS-accredited laboratory.
REVIEW FREQUENCY: PROPERTY-DEPENDENT
Asbestos Management Survey
Asbestos management surveys in London for residential properties, the communal areas of blocks of flats, HMOs and commercial premises. The survey identifies and assesses asbestos-containing materials within its scope. The standard price includes one sample collected by the surveyor and its analysis by a UKAS-accredited laboratory.
QUICK ANSWERS
What is included in the standard price?
The management survey, one sample collected by the surveyor, analysis of that sample by a UKAS-accredited laboratory, and a survey report within 24 hours after the inspection and laboratory analysis.
What does the survey cost?
£250.00, including one sample and its laboratory analysis. Additional samples are charged separately.
What is not included?
An asbestos register, an asbestos management plan, asbestos removal or remediation, and refurbishment and demolition surveys.
Which properties do you survey?
Residential properties, the communal areas of blocks of flats, houses in multiple occupation (HMOs) and commercial premises.
What an Asbestos Management Survey Records
An asbestos management survey looks for asbestos-containing materials that could be disturbed or damaged during normal occupation of a building or during routine maintenance, and assesses their condition, within the areas agreed for the survey. Anything that could not be accessed is recorded as not inspected rather than assumed clear.
It is not a refurbishment or demolition survey. Those are more intrusive surveys carried out before building work that will disturb the fabric, and they are not part of this service.
The standard survey includes one sample collected by the surveyor, analysis of that sample by a UKAS-accredited laboratory, and a survey report issued within 24 hours after the inspection and laboratory analysis. Additional samples are charged separately.
The survey does not include an asbestos register or an asbestos management plan. Where the duty to manage asbestos applies, those remain the duty holder’s responsibility, and buying a survey does not on its own meet every part of that duty.
Review frequency is property-dependent. There is no single fixed renewal period: how often the asbestos information should be reviewed depends on the property’s circumstances, including the condition of any materials identified and any alterations, refurbishment or change of use.
LEGAL BASIS
Control of Asbestos Regulations 2012
Regulation 4 places a duty to manage asbestos on whoever is responsible for maintenance of non-domestic premises, including the common parts of domestic premises. The duty holder must take reasonable steps to find asbestos-containing materials, assess their condition, record the findings, assess the risk and prepare and act on a management plan. HSG264 sets out the survey methodology.
Who this is for, and the properties it applies to.
Residential properties
Landlords and owners of houses and flats who want asbestos-containing materials in a property identified and assessed. The duty to manage asbestos does not apply to the inside of an individual private home in the way it applies to common parts.
Communal areas of blocks of flats
Freeholders, managing agents and property managers responsible for the entrances, stairways, corridors and other shared parts of a block.
Houses in multiple occupation (HMOs)
Landlords and managing agents of HMOs, including the areas shared by more than one household.
Commercial premises
Owners, occupiers and managing agents of shops, offices and other commercial property.
SUITABLE PROPERTY TYPES
- Residential property
- Commercial property
CATEGORY
Other Services
The inspection, in the order it happens.
Enquiry and property details
You tell us the property, its type and the areas that need surveying.
Scope and access
The areas to be surveyed are agreed before the visit, and you arrange access. Anything that cannot be accessed is recorded as not inspected rather than assumed clear.
On-site management survey
The surveyor inspects the agreed areas for materials that may contain asbestos and could be disturbed during normal occupation or routine maintenance.
Sampling
Where a sample is needed to identify a material, the surveyor collects it. One sample is included in the standard price; additional samples are charged separately.
Laboratory analysis
Samples are analysed by a UKAS-accredited laboratory.
Survey report
The survey report is issued within 24 hours after the inspection and laboratory analysis.
Asbestos Management Survey tiers, with the unit of sale on every line.
Tiers are priced by what is actually being inspected. Every line can be booked directly.
Asbestos management survey
| TIER | UNIT OF SALE | PRICE | Book |
|---|---|---|---|
| Asbestos management survey | Asbestos management survey | £250.00 | Book Asbestos Management Survey, Asbestos management survey |
The price covers the management survey, one sample collected by the surveyor, analysis of that sample by a UKAS-accredited laboratory, and the survey report, issued within 24 hours after the inspection and laboratory analysis. Additional samples are charged separately. An asbestos register, an asbestos management plan, asbestos removal or remediation, and refurbishment and demolition surveys are not included.
If asbestos is found
Consider the findings
The report sets out what the survey identified within the areas surveyed. Read it before any maintenance or other work that could disturb the materials.
Get appropriate advice
Where asbestos-containing materials are identified, obtain appropriate advice about how they should be managed, or whether further action is needed.
Share the information
Where the duty to manage applies, information about the location and condition of asbestos must be given to anyone liable to disturb it, including your own contractors.
Not part of this service
Asbestos removal, remediation, an asbestos register and an asbestos management plan are not included in this survey.
Asked about Asbestos Management Survey.
A survey to find and assess asbestos-containing materials that could be disturbed or damaged during normal occupation or routine maintenance, within the areas agreed for the survey. It is designed for a building in normal use, not for building work.
Haven’s standard asbestos management survey in London is £250.00. That includes one sample collected by the surveyor and its analysis by a UKAS-accredited laboratory. Additional samples are charged separately.
The management survey, one sample collected by the surveyor, analysis of that sample by a UKAS-accredited laboratory, and a survey report issued within 24 hours after the inspection and laboratory analysis.
Yes. Where a sample is needed to identify a material, the surveyor collects it, and it is analysed by a UKAS-accredited laboratory. One sample is included in the standard price.
One. Additional samples are charged separately.
Within 24 hours after the inspection and the laboratory analysis have both been completed. The 24 hours is counted from the end of the laboratory analysis, not from booking or from the visit.
It depends on the property. The duty to manage asbestos in the Control of Asbestos Regulations 2012 applies to non-domestic premises, which include the common parts of residential buildings, such as the communal areas of a block. It does not apply to the inside of an individual private home in the same way. If you are unsure whether the duty applies to your building, take appropriate advice.
Yes. The communal areas of a block, such as entrances, stairways and corridors, can be surveyed. Tell us which areas need surveying when you book.
Yes. Houses in multiple occupation are covered, including the areas shared by more than one household.
Yes. Commercial premises are covered by this service.
No. An asbestos register is not included. Where the duty to manage applies, keeping a record of asbestos-containing materials is the duty holder’s responsibility, and the survey findings can inform it.
No. An asbestos management plan is not included. Where the duty to manage applies, preparing and acting on a plan is the duty holder’s responsibility.
Consider the findings in the report and obtain appropriate advice about how the materials should be managed, or whether further action is needed. Asbestos removal and remediation are not part of this service.
No. A management survey is for a building in normal use. A refurbishment and demolition survey is a separate, more intrusive survey carried out before work that will disturb the fabric of the building. Refurbishment and demolition surveys are not part of this service.
There is no single fixed renewal period: it depends on the property. Asbestos information should be reviewed when circumstances change, for example if the condition of identified materials changes, the building is altered or refurbished, or its use changes. Where the duty to manage applies, the duty holder must keep the information up to date and monitor the condition of any asbestos-containing materials.
No. Sampling disturbs the material, so do not take samples yourself. Under this service the surveyor collects the sample, and it is analysed by a UKAS-accredited laboratory.
Asbestos Management Survey in London.
Serving Central London and nearby postcodes. One engineer network and one renewal calendar. Where the qualifications overlap, several services can be covered in a single visit.
Other services for your property, booked separately.
Fire Risk Assessment
Regulatory Reform (Fire Safety) Order 2005, as amended by the Fire Safety Act 2021 and section 156 of the Building Safety Act 2022
EICR
Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020
Energy Performance Certificate
Energy Performance of Buildings (England and Wales) Regulations 2012, with the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015
Book an asbestos management survey anywhere in London.
Weekday morning and afternoon appointments. The survey report is issued within 24 hours after the inspection and laboratory analysis.